During the pre-commissioning process, systems must be rid of loose debris and hydro testing fluid prior to start-up. The two most common methods for this type of system cleaning are air blowing and high velocity flushing.
Any scheduled maintenance and inspection performed in the oil and gas industry first requires the reduction and removal of potential hazards from the systems being maintained. These hazards can include hydrocarbons/ LEL’s, benzene, H2S, iron sulphide (pyrophoric iron), ammonia, and mercaptans.
A combined-cycle power plant uses both gas and steam turbines together to produce up to 50 percent more electricity from the same fuel than a traditional simple cycle plant.